Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3964.35
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Apr 12, 2020     Avionics rack - construction and test-fitting - (3.5 hours)       Category: Avionics
Continued building the main avionics rack behind the panel. The main structure is now mostly complete, so today I drilled and countersunk most of the rest of the nutplate holes. Primed most parts. Clamped the base plate and supports into the airplane to see what the best way to attach it would be. It turns out the flange of the forward cross-brace sits at a slightly different angle from the z-channel just forward of it. This means that the baseplate does not sit flat (see photo #2). I began to figure out how I'll correct for this. My first thought was to bend the three supports a few degrees, but they are made of 0.090" aluminum, and my bending brake is only capable of handling 0,040". Next, I considered bending the baseplate just aft of the support angle, but this would mis-align several of the threaded standoffs between the lower and upper levels. Finally, I researched screw shims and tapered washers at McMaster-Carr. I found a few items that might work, so I ordered them. We'll see.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.